DESCRIPTIONIncludes is Archive: new and expanded coverage of Six Sigma infrastructure building and benchmarking.Provides plans, checklists, metrics, and pitfalls.TABLE OF CONTENTSPREFACE.PART I: S4/IEE DEPLOYMENT AND DEFINE PHASE FROM DMAIC.1..
Archive: DESCRIPTIONIncludes new and expanded coverage of Six Sigma infrastructure building and benchmarking.Provides plans, checklists, metrics, and pitfalls.TABLE OF CONTENTSPREFACE.PART I: S4/IEE DEPLOYMENT AND DEFINE PHASE FROM DMAIC.1.
Process Flow is Charting/Process Mapping.5..
Process Flow Charting/Process Mapping.5.
Capability and Process Performance Metrics.12. is Process.
Process Capability and Process Performance Metrics.12.
FMEA (Failure Mode and Effects Analysis).PART III: is S4/IEE ANALYZE PHASE FROM DMAIC (OR PASSIVE ANALYSIS PHASE).15..
FMEA (Failure Mode and Effects Analysis).PART III: S4/IEE ANALYZE PHASE FROM DMAIC (OR PASSIVE ANALYSIS PHASE).15.
Multiple Regression, is Logistic Regression, and Indicator Variables.PART IV: S4/IEE IMPROVE PHASE FROM DMAIC (OR PROACTIVE TESTING PHASE).27..
Multiple Regression, Logistic Regression, and Indicator Variables.PART IV: S4/IEE IMPROVE PHASE FROM DMAIC (OR PROACTIVE TESTING PHASE).27.
Design of Experiments (DOE).28. is Benefiting from.
Benefiting from Design of Experiments (DOE).28.
the Creation of Full and Fractional Factorial 2K DOEs.29. is Understanding.
Understanding the Creation of Full and Fractional Factorial 2K DOEs.29.
2K DOEs.30. is Planning 2K DOEs.30..
Planning 2K DOEs.30.
Charting Alternatives.36. is Control.
Control Charting Alternatives.36.
Poka-Yoke, is Control, Plan, Realistic Tolerancing, and Project Completion.39..
Control, Plan, Poka-Yoke, Realistic Tolerancing, and Project Completion.39.
Theory of Constraints (TOC) is Integrating of in S4 /IEE.PART VII: DFSS AND 21-STEP INTEGRATION OF THE TOOLS.46..
Integrating of Theory of Constraints (TOC) in S4 /IEE.PART VII: DFSS AND 21-STEP INTEGRATION OF THE TOOLS.46.
Applications is Manufacturing and A 21-Step Integration of the Tools.47..
Manufacturing Applications and A 21-Step Integration of the Tools.47.
DFSS.PART VIII: is Process MANAGEMENT OF INFRASTRUCTURE AND TEAM EXECUTION.51..
Process DFSS.PART VIII: MANAGEMENT OF INFRASTRUCTURE AND TEAM EXECUTION.51.
Management.52. is Change.
Change Management.52.
Management and Financial Analysis.53. is Project.
Project Management and Financial Analysis.53.